I'd say geometry work is at about... 60-70%. Detail, lights, and texturing is at about... 30%. Left to be built is the central room with the elevator, the large room below that, and then the hive below that. I'll be doing most of that as soon as we stop fiddling around with texture related problems and can get the whole map itself in a position to be worked on. I'm putting a firm stop to working on multiple bits at once, the cleanup required negates any time saved. Also, the area around bijiy's hive needs to be finished, there's no hallways there at the moment. And there's some halls around MS still needing building. So there's a fair bit left to be done before we even have a playable beta version. But as soon as there is one, you'll all be the first to know about it.